[Sprint 6] Button Sequences (Phrase Building)

Jule
-
[Sprint 6] Button Sequences (Phrase Building)

How do you close the existing sprint and start the next ..the dates ending does not automatically roll it forward to. Jun 19, 2025the problem arises when trying to show the sprint overview in azure devops. Earlier, when we had a "flat" list of our sprints / iterations, azure devops would also jump to the "correct".

Is there a difference between sprint and an iteration or one can have iterations within a sprint or sprint is just the terminology used instead of iteration in scrum? Sep 13, 2023we have our user stories and corresponding tasks (set as children of the storiies) moved into particular sprint. Along with those, we have some bugs put into the same sprint, too.

Apr 11, 2023is there anything something like "https://www.example.com/jira/rest/agile/1.0/sprint?project=xyz", to retrieve all the sprints in a jira. May 31, 2024on the sprint board in azure devops, a split option is available for use on a user story at the end of a sprint to create a copy of the story and assign it to the following sprint along with. Jul 20, 201713 fmt.sprint is good for concatenating parameters of different types as it uses reflection under the hood.

Oct 18, 2023when attempting to assign someone to a bug or task on the azure devops sprint board i can see a number of users that are no longer in my teams on devops or on the azure.

Images Gallery

You may also like